Real estate template

Zoning check

Read a parcel against the zoning code and its overlays. See the permitted uses, the limits and the questions to take to planning, each cited to its section.

Illustrative app build · fictional data

Test the concept

Can we build six stories here?

One question can touch more than one section of the code. Keep the base district, the overlay and the proposed use together.

Alder Reach municipal code

MU-2 district · fictional municipality and code

text · §18.24.050

Building height shall not exceed sixty feet or five stories, whichever is less.

Your concept

6 stories

District maximum

5 stories

text · §18.62.040

Development within the mapped creek overlay is subject to the riparian setback in addition to the base district requirements.

  1. 01

    Start with the district

    MU-2 permits mixed-use residential, with a maximum of sixty feet or five stories.

  2. 02

    Add the overlay

    The creek rules apply as well. A permitted use does not remove the extra setback.

  3. 03

    Bring the question to planning

    The report shows the sections behind the flag so the development team can decide what to investigate next.

The app

A parcel, its limits, and the source.

Read the allowances beside the parcel plan. Each answer carries the code section your team needs to check.

Zoning check180 Foundry LaneSearchAsk

180 Foundry Lane

Town of Alder Reach · MU-2 · Parcel AR-204-18

Request variance memo
Parcel and envelope0.72 acres
Creek overlayRear setback · 20 ftFront setback · 15 ft180 Foundry LaneBuildable envelopeIllustrative parcelN ↑
Parcel plan · p. 1

Diagram for review. Confirm dimensions against the survey.

What the code allows

Permitted use§18.24.020

Mixed-use residential

Height§18.24.050

60 ft / 5 stories

Floor area ratio§18.24.060

3.0 maximum

Lot coverage§18.24.070

70% maximum

Setbacks§18.24.080

Front 15 ft · rear 20 ft

Parking§18.40.030

1 space per dwelling

Six stories need further review

The base district caps height at five stories. The creek overlay also constrains the east side. Take both sections to planning before relying on the concept.

Height · §18.24.050Overlay · §18.62.040

What it reads

  • Parcel details and surveys
  • Local zoning code
  • District and overlay documents

What your team sees

  • A parcel report with code citations
  • Uses, height and setbacks
  • Questions for the planning team

What you set

  • The parcel and proposed use
  • Development questions to test
  • Who reviews the report

Questions

What people ask about zoning check.

Can our team check the source behind an answer?

Yes. Extracted values and answers carry source citations, so your team can read the passage behind them before acting.

Can we change the questions the app checks?

Yes. Tell the Assistant what you need. It can change workflows and apps, with the changes shown for your approval.

Do we have to build the app ourselves?

No. We can set it up around your process and hand your team an app ready to use. Your team can change it later or ask us to.

Is our data used to train models?

No. Your documents and results are never used to train a model, and a data processing addendum backs that.

Can it run in our own cloud?

Yes. Strive runs in our cloud, or in your own VPC on AWS, Google Cloud or Oracle Cloud, or on your own Kubernetes cluster.

Which document-heavy job would you hand over first?

Bring one process you want to improve and the information behind it. We build the first version with you in the session, so the first thing you see is your own work, running.

Contact Sales

An hour of your time and a process you know well. That's all it takes.